Skip to main content

Asset Management Reference

Summary​

Complete Draft consolidated reference for Asset Management: terminology, the ten-status lifecycle and transition matrix, the frontend route catalog, an API summary reconciled to the authoritative API catalog, a permissions and enforcement matrix, a validation catalog, an event summary, an integration matrix, a database summary, an implementation-maturity matrix across all nine documentation dimensions, consolidated limitations, and an authoritative module source map.

Audience​

Engineering, QA, support, architecture, security reviewers, product owners, and implementation partners.

Overview​

This section summarizes and cross-links the authoritative material produced across Asset Management Epics 13.1–13.6. It does not duplicate the full API, database, or event catalogs; it reconciles to them and adds the module-level consolidations (maturity, permissions, limitations, source map) that only make sense once every dimension is documented.

Verified anchors carried into this reference: ten lifecycle statuses and five conditions, a native asset-service API surface plus a monolith-shaped compatibility surface, six domain events mapped to six integration contracts, seven persisted object sets with application-only tenant isolation, and a Partial UI. Where a capability is designed but not fully realized, it is classified rather than overstated.

Documentation map​

Requires confirmation​

Backend authorization policy for the asset surface, monitoring/alerting and ownership, retention governance, and compatibility retirement remain open and are tracked in the relevant pages.

Source References​

  • microservices/src/asset-service/Domain/Common/Enums.cs
  • microservices/src/asset-service/Domain/Asset/Asset.cs
  • microservices/src/asset-service/Api/AssetEndpoints.cs
  • microservices/src/asset-service/Api/AssetCompatEndpoints.cs

See Also​

Keywords​

  • Asset reference
  • Implementation maturity
  • Consolidated limitations

Revision Information​

  • Status: Draft
  • Last reviewed: 2026-07-17
  • Review cycle: Quarterly